+91 484 4078931, +91 938 808 5201

 

RDS Aura

OVERVIEW

Our latest apartment complex coming up on KP Vallon Road Kadavanthara is designed for a serene life style in the heart of the city. The location is close to shopping arcades, places of worship, indoor stadium, hospitals and above all is overlooking the BhawansVidhyaMandir. The complex will have forty six 3BHK apartments of 2100sq.ft each. True to RDS tradition, the layout, space utilization, ventilation etc have been given special attention. The amenities provided in the first floor can match any similar complex in the city. The construction is likely to be completed by the end of June 2015.

Specification

Structure
RCC Framed Structure with cement concrete solid block masonry on deep pile foundation

Painting
Putti finished emulsion for internal walls.
Melamine Polish for entrance doors.
Enamel paint for internal doors.
Exterior emulsion for external walls.

Flooring
Vitrified Tile Flooring
600/600mm for bedrooms, dining, living area and kitchen.
Anti skid tiles for bathrooms and balcony.
Granite for foyer.

Water
KWA connection for drinking purpose. (Subject to KWA Regulations)
Tube well and rain water harvesting for non-drinking purpose.

Kitchen/Work Area
2’ High glazed tile dado above counter level.
Provision for kitchen sink, water purifier and washing machine.
Adequate electrical points for kitchen gadgets

Electric Supply
Concealed Copper wiring with adequate light and plug points.
3 phase electric connection.
Provision for generator back up to 1 KWA except for power.
Good quality modular switches.

Toilets
Glazed tiles dado up to 7’ height.
Concealed Plumbing lines with superior quality CP fittings.
(Jacquar or equivalent)

Access Control
Modern access control
with video door phone.

Doors
Main Door: Teak wood frame with teak wood shutters.
Internal Doors: Good quality flush doors.
Balcony Door: Powder coated Aluminum frame with glass.

Elevators
One passenger lift and
one stretcher lift.

Windows
Powder coated Aluminum frame
with Glass.

 

PROGRESS

  Bhoomipooja
  Piling
  Pile cap Concreting
 
  Work Progress – June 2013
  Work Progress – July 2013
  4th Floor Structure completed – Aug 2013
  Work progress – September 2013
  Work Progress – October 2013
  Work Progress – December 2013
 
  Work Progress – January 2014
  Work Progress – February 2014
  Work Progress – April 2014

E-BROCHURE

 

APPLICATION FORM

AVILABILITY CHART

RDS AURA
  FACING  EAST FACING  WEST   
A (N-E) B ( S-E) C (S-W) D (N-W)
First Floor POOL POOL IC
SOLD
ID
SOLD
2
2ND FLOOR 2A
SOLD
2B
SOLD
2C
SOLD
2D
SOLD
4
3RD FLOOR 3A
SOLD
3B
SOLD
3C
SOLD
3D
SOLD
4
4TH FLOOR 4A
SOLD
4B
SOLD
4C
SOLD
4D
SOLD
4
5TH FLOOR 5A
SOLD
5B
SOLD
5C
SOLD
5D
SOLD
4
6TH FLOOR 6A
SOLD
6B
SOLD
6C
SOLD
6D
SOLD
4
7TH FLOOR 7A
SOLD
7B
SOLD
7C
SOLD
7D
SOLD
4
8TH FLOOR 8A SOLD 8B
SOLD
8C
SOLD
8D
SOLD
4
9TH FLOOR 9A
SOLD
9B
SOLD
9C
SOLD
9D
SOLD
4
10TH FLOOR 10A SOLD 10B
SOLD
10C
SOLD
10D
SOLD
4
11TH FLOOR 11A
SOLD
11B
SOLD
11C
SOLD
11D
SOLD
4
12TH FLOOR 12A
SOLD
12B
SOLD
12C
SOLD
12D
SOLD
4
46

FLOOR PLAN

Site layout

Basement

Ground Floor

First Floor

Typical Floor

Typical Unit